PROJECT: P D C BUILDING
PROJECT: P D C BUILDING
![](https://panelmatic.com/wp-content/uploads/2020/07/20150603_155648-1024x576.jpeg)
Customer: National Fuel and Gas Supply • Dimensions: 20’ W x 53’6” L x 12’6” H
• Panelmatic standard heavy duty welded construction (11ga galvanneal exterior &14ga galvanneal interior)
• Insulated walls (R21), floor (R21), and ceiling (R49)
• Fabricated in 2 halves for ease of shipping
• Three (3) HVAC Wall Mount Units
• Lifting lugs strategically placed to ensure safe loading/lifting/transportation
• Office space with fire rated wall separating equipment room
• Bottom-entry cable penetrations for power distribution
• Shrink wrapped to protect open halves during shipping
• In-field installation by Panelmatic (bolt and seal building halves)
![](https://panelmatic.com/wp-content/uploads/2020/07/Screenshot_2015-06-16-16-19-46-1024x576.jpeg)
![](https://panelmatic.com/wp-content/uploads/2020/07/20150604_161745-1024x576.jpeg)
![](https://panelmatic.com/wp-content/uploads/2020/07/20150603_155648-1024x576.jpeg)
![](https://panelmatic.com/wp-content/uploads/2020/07/7101-59-1024x768.jpg)
![](https://panelmatic.com/wp-content/uploads/2020/07/7101-56-768x1024.jpg)
![](https://panelmatic.com/wp-content/uploads/2020/07/7101-36-768x1024.jpg)