GENERAL

NAME:


EMAIL:


LOCATION OF THE SITE CITY:


Customer Preferred Fire System?

PROJECT NAME:


AMBIENT WEATHER DESIGN CONDITIONS:


SIZE OF RIE:
Standard 12' X 11 '7" by 26'L
Standard 12' X 11 '7" by 32'L
Standard 12' X 11 '7" by 56'L
Other


NOTE: Standard dimensions are overall outside

ELECTRICAL AREA CLASSIFICATION:
General Purpose
Class 1 Division 2
Other


SEISMIC REQUIREMENTS?:


HVAC REQUIRED?:
YES
NO

PE STAMP REQUIRED?:
YES
NO

UPS REQUIRED?:
YES
NO

FIRE DETECTION REQUIRED?:
YES
NO

FIRE SUPPRESSION SYSTEM REQUIRED?:
YES
NO

GAS DETECTION SYSTEM REQUIRED?:
YES
NO

COMBUSTIBLE GAS?:
YES
NO

TOXIC GAS?:
YES
NO

AIR LOCK REQUIRED?:
YES
NO

CONTROL CABINET ENCLOSURES:
Rittal
Markhon
Other


TOTAL NUMBER OF CABINETS MOUNTED IN RIE:


MARSHALLING CABINET REQUIRED?:
YES
NO

ADDITIONAL EQUIPMENT WITHIN THE RIE:
Workstation
Coat Racks
Other - Fire Extinguishers
Humidity sensor as analog input to DCS
Temperature sensor as digital input to DCS


EQUIPMENT TO BE INSTALLED WITHIN THE RIE?:
YES
NO

SIS CABINETS:


VIBRATION MONITORING CABINETS:


AUXILIARY CABINET:


OTHER.:


DCS CAB:


BASIC STRUCTURE

Computer Floor Height:
8" (std)
Other



Insulation Requirements

Roof:
R-21(std)
Other


Floor:
R-19(std)
Other


Walls:
R-11(std)
Other



Gauge Requirements

Sub-Floor:
1/4" steel(std)
Other


Walls Panels:
18 gauge steel (std)
Other


Roof Panels:
18 gauge steel
Other


Inside:
White(std)
Other


Outside:
White
Other


Stairs (one per door):
YES
NO

(Painted):
YES
NO

(Galvanized):
YES
NO

MAIN ELECTRICAL DISTRIBUTION

Main RIE Power Feed:
480 3 ph Wye
480 3 ph Delta
240 3 ph
208 3 ph
Other


Feed Frequency:
60HZ(std)
50HZ
Other


Redundant Main Power Panels:
Yes
No (225 Amp std)


Single Main Power Panels:
Yes
No (225 Amp std)


Utility Distribution Panel:
Yes(std)
No (30 Amp std)


(Standard utility panel is 120/208 "Y")

Step Down Transformer (9KVA std) :
Yes(std)
No (for utility power)


(Standard step down transformer is 480 V 3P/120/208 3P)

Circuit Breaker Type:
1 phase
3 phase


Fusible Switch Type:
1 phase
3 phase



DCS Power Distribution Panel (Primary)

Circuit Breaker Type:
1 phase
3 phase


Fusible Switch Type:
1 phase
3 phase



DCS Power Distribution Panel (Secondary)

Circuit Breaker Type:
1 phase
3 phase


Fusible Switch Type:
1 phase
3 phase


480v 3 P Auto Transfer Switch:
YES
NO

Isolation Transformers:
YES
NO

Inside Conduit Type:
EMT(std)
Other


Exterior Conduit Type:
EMT(std)
Other


Wire Gauge:
Per NEC requirements
Other


Wire Type:
THHN/THWN(120V)
Other


Panelmatic standard transformers are rated for 150 degree C temperature rise

UPS REQUIREMENTS

UPS Capacity (KVA):


Dual UPS:
YES
NO

Separate Room for UPS:
YES
NO

Separate Room for Batteries:
YES
NO


Customer Preferred UPS vendor?

Vendor Name:


Static Transfer Switch (Internal):
YES
NO

Internal Bypass Switches (Maintenance) :
YES
NO

External Bypass Switches (Maintenance) :
YES
NO

Output:
120/208 1P
Other


Battery Charger:
YES
NO

Inverter System:
YES
NO

Battery Backup Time:
30 Min
Other


Battery Drip Pan (304 SS):
YES
NO

Battery Type:
Sealed Gel Cell (recommended)
Flooded Wet Cell
10 year life
20 year life


** NOTE: Gel cell batteries do not require a special battery room/enclosure,
flooded wet cells do.


HVAC REQUIREMENTS

Redundant HVAC Units:
YES
NO

Tonnage:
4(std)
5(std)
7 1/2
10
Other (sizing to be verified by vendor)


Stainless Steel Case:
YES
NO

Corrosive Environment:
YES
NO

Vendor Name:


Internal Heat Loads of customer supplied Equipment :


Outside Air Filtration System:
Yes
No
Other


(Standard filters remove 90% of particulates by weight down to .3 microns particle size)

Filter Type:
Potassium Permanganate
Activated Carbon


Filtration Redundancy:
Redundant Blowers
Non Redundant Blowers


Pressurization Required:
YES
NO

(Standard is .1 inch of H2O at 300 CFM maximum leakage)

Stainless Steel Case:
YES
NO

Stack Required:
YES
NO

Stack Height:
22' (std)
Other


Class 1 Division 2:
YES
NO

Type Purging:
Z
Other


HVAC/Pressurization system will shut down if fire and/or gas detection system are alarmed.

FIRE PROTECTION REQUIREMENTS


Note: Both Automatic and Manual Fire Protection Systems come with smoke
detection system.


Automatic or Manual Suppression:
Automatic
Manual(std)


Vendor Name:


Hand Fire Extinguisher:
YES
NO

If yes give qty., manufacturer and model:


Hand Fire Extinguisher Agent:
CO2(std)
Other


(Note: Standard Hand fire extinguishers are 15 lb units)

Automatic Fire Extinguishing Agent :
FM200(std)
Other


Fire detection will shut down HVAC
and send a dry contact alarm to DCS.


GAS DETECTION REQUIREMENTS

Combustible Gas Detection:
YES
NO

H2S Gas Detection:
YES
NO

Preferred Vendor Name:


Other Detection:
YES
NO

If yes, please describe:


Calibration Kits:
YES
NO

Gas Detection will SHUT DOWN HVAC and send a Dry Contact Alarm to DCS.

GROUNDING SYSTEM

External Grounding Pads:
Yes 4(std)
No


Safety Ground Busses:
2 (std)
Other


Reference Ground Busses:
Yes (1 std)
No


Safety Ground:
Green w/ Yellow (per NEC)
Green
Other


Master Reference:
Green (per NEC)
Green with Yellow
Other


LIGHTING

Fluorescent fixtures:
Yes (std)
Other


Emergency Lights:
Yes (std)
No


Backup Time:


MARSHALLING

Termination Cabinet Construction:
Termination equip to be wall mounted (std)
Termination to be in free standing cabinets


(Note: The standard depth of the Marshalling cabinet is 12\")

Approximate Termination Area Length:


Sliding Doors with Frames?:
YES
NO

Approximate Termination Area Length:


Sliding Doors with Frames?:
YES
NO

FTA's Mounted in Marshalling Cabinet:
YES
NO

If yes give qty., manufacturer and model :


Terminal Block to be Mounted:
YES
NO

Quantity Based on I/O count times 2.5:


Other Items Mounted in Marshalling Cabinet:
YES
NO

If yes give qty., manufacturer and model :


Surge Suppressors Required?:
YES
NO

If yes give qty., manufacturer and model :


We have assumed one FTA cable for
each wall mounted FTA


INSTRUMENT WIRE

Marshalling Wiring Required :
YES
NO

Wiring:
Twisted Pair #18 UL1007
Single Conductor #18 UL1007
Per Project Wire Specification
Other


Wire Tags:
One Per Pair(std)
One Per Wire


Color Code:
Per Project Database


Wire Classification :
Unclassified(std)
NonIncendive
Intrinsically Safe


Pos:
Black
Other


Neg:
White
Other


Grnd:
Green
Other


Pos:
Red
Other


Neg:
Black
Other


Grnd:
Green
Other


Pos:
Black
Other


Neg:
White
Other


Shld:
Bare
Other


Thermocouple Type:


TC Terminal Blocks:
Feed Through
TC Type
Other


Terminal Blocks Mfg :
Weidmuller(std)
Phoenix
Other


Fused I/O Required? :
AI
DI
DO
AO
Indication Type


Both sides of loop?:
YES
NO

I/O COUNT


DCS

AI:


AO:


DI:


DO:


SI:


TC:



SIS

DI:


DO:


AI:


AO:



Other Point Count

DI:


DO:


AI:


AO:


(Note: Each type of loop is considered to use two wires as a standard, with the
exception of RTD's which use three as a
standard. All DO are considered to be
dry contacts and use only two wires per loop)


FAT/STAGING REQUIREMENTS


NOTE: The items listed below are items that are NOT going to be placed in
the RIE, but will have to be set up external of the RIE for system test.

Cabinets to be set in FAT area


No. of Bays:


Monitors:



Duration

No of Weeks:



Support

No. of Engineers hrs.:


No. of Technicians hrs.:



Special Requirements

No. of Tables:


No. of Phones:


No. of Lan Connections:



Test Equipment

Standard Set:


Special Requirements:


Test Question2:


OTHER REQUIREMENTS

Other Requirements: